holdingsmanagersallocation
Eastpoint III is a two-building concrete tilt-wall warehouse/distribution project completed in January 2000. The buildings are located on a 5.7-acre site that provides 166 parking stalls. The buildings provide ample loading facilities, with a 18 dock-high doors, two at-grade doors, and one drive-up ramp.